This paper outlines the detailed design and installation procedure for the Delta State University Teaching Hospital (DELSUTH) 300kVA 11/0.415kV transformer for health care facility. The data used in this work is drawn from load survey, information based on related works, and onsite physical assessment. The data collected was analyzed, based on the results of design and installation of the transformer. Results obtained from pre-commissioning test show that the design and installation work agree with industry approved standards. More importantly, this work has led to improvement in operations of the health care facility.